- Joined
- Oct 31, 2021
- Messages
- 301
- Reaction score
- 104
- Points
- 43
- Age
- 47
- Location
- Maryland
- Model
- Explorer
Ok, so here is the plan. My 92 246 Explorer came with only the rear fuel tank. I have the front Aux tank, boat is pre-plumbed with inlet, vent and feed lines. (47 gal) but to install I'll need to move the raw water strainer from the forward access hatch to the rear bilge. It currently used for the port livewell and raw water washdown on a diverter valve. Moving it is no big deal. I have a guy for the fiberglass work. But my question is, long term, I plan to run 3 raw water pumps. 1 for port livewell, 1 for aft livewell (which is not yet plumbed) , and 1 for raw water wash down. Do I need 3 inlets (strainers)? Or can I run 3 pumps off 1, 3/4 inch inlet stainer? Or maybe 3 pumps off 2 inlets. How you you branch them off?? I was digging around trying to locate bronze tees but can not locate any. I prefer not to use plastic. Future upgrades but trying to plan everything out before I start cutting holes, and have to move things around for a second or third time. LOL!!