- Joined
- Feb 2, 2021
- Messages
- 47
- Reaction score
- 2
- Points
- 8
- Age
- 43
- Model
- Chase
I bought my Chase 263 from a guy that kept it on a lift. I found a 10k trailer locally, but the bunks are not ideally setup (a lot of weight is on smaller front bunks and makes it difficult to get boat on/off). I've suffered with it long enough and want it corrected for this season. The brackets are rusty and carpet needs redone, but I believe wood is good (small front ones appear 2x4 size, so likely not expensive, but two large back ones no doubt are $$$).
There's really only one major trailer shop in town and when I called them today, they won't give even the slightest estimate. I didn't expect one for parts, but I just wanted to know "on avg, how many hrs does it take to setup a trailer"? Nada. All he'd say is labor is $147/hr and we'll call with a quote before doing any work. They have a lift and sling the boats to assist in setup, so no doubt it'll be correct, but how long does this take? 4hrs? 8hrs? I can estimate parts, but I'm just trying to figure out if this is a $2k job, $4k job, etc?
There's really only one major trailer shop in town and when I called them today, they won't give even the slightest estimate. I didn't expect one for parts, but I just wanted to know "on avg, how many hrs does it take to setup a trailer"? Nada. All he'd say is labor is $147/hr and we'll call with a quote before doing any work. They have a lift and sling the boats to assist in setup, so no doubt it'll be correct, but how long does this take? 4hrs? 8hrs? I can estimate parts, but I'm just trying to figure out if this is a $2k job, $4k job, etc?