Search results

  1. C

    1987 24' Grady CC Project - Miami

    haa! I wish! Tightening up some loose ends in the hull - running PVC, pouring new foam, glassing the foam, cutting holes and puttying them, adding some reinforcement to cap, coal tar the tanks, place tanks in place. HOPING that Friday we get to reconnect the hull and the cap. Trying very hard...
  2. C

    1987 24' Grady CC Project - Miami

    Thanks, Family Affair!! Cap was a piece of cake. Some of the foam from what was in the stringers was keeping it down, and some thu-bolts from where rear gunnels laid over cap. Once bolts pulled, rub rail removed, it was quick. Whole thing was about 2 hrs to remove. When it is re-laid, we will...
  3. C

    1987 24' Grady CC Project - Miami

    Will be a tuna door in the side of the boat. Was going to go transom but with adding the rear bench etc it does not fit there.
  4. C

    1987 24' Grady CC Project - Miami

    alright guys .. that brings you up to date ... jump in and let me know what you think! glad to be here!
  5. C

    1987 24' Grady CC Project - Miami

    rain is making for slow progress drilled all the limber holes today in bulkheads/stringers laid out rough console sketch received 5 lumitec engine room lights to put in bilge, console, hatches.. excited for them got the garmin 215 w / ais in ordered the arctic white rub rail ordered the rub rail...
  6. C

    1987 24' Grady CC Project - Miami

    more cap ..
  7. C

    1987 24' Grady CC Project - Miami

    cap cleaning
  8. C

    1987 24' Grady CC Project - Miami

    this weekend I think the cap is going to be done. - I'll get as many photos as I can of the old wood out, foam board in replacement. Hull is completed except the PVC plumbing which might be done this weekend or Monday. Tanks and brackets should be installed by Wednesday? So - if all goes well -...
  9. C

    1987 24' Grady CC Project - Miami

    more hatch work, NEW twin bracket
  10. C

    1987 24' Grady CC Project - Miami

    Been busy the last two weeks but got a fair amount of stuff done console getting patched up flat .. any suggesting for bringing that lip inside the console even though we have a cooler at the front? hatches are all recored with composite. cap is getting dug out and recored
  11. C

    1987 24' Grady CC Project - Miami

    Transom is triple layered up just going to tab the edges and then the stringers will connect in existing outside stringers that are staying are getting initial lay in with the foam board 1/2 laminated to sides of them and then some layers of on top. They will then be completely encased around...
  12. C

    1987 24' Grady CC Project - Miami

    transom lights and controller ..
  13. C

    1987 24' Grady CC Project - Miami

    picked up (2) 943xsv and (1) 1243xsv for the console should be plenty of firepower screen wise
  14. C

    1987 24' Grady CC Project - Miami

    ordered new tanks today. 107 gallon and 53 gallon exactly as per Grady drawings from factory. also ordered new bracket w/ swim platform. twin motor flotation bracket (84" x 30") w/ 44" x 20" box 3/4". White painted, with medium grey w/ nonskid on the top to match hull color. ladder on the right...
  15. C

    1987 24' Grady CC Project - Miami

    sold the old top on Facebook market place and picked up this hard top someone paid 8k for (with receipts) for $1800 after some negotiation.. w/ outrigger bases, LEDs etc its 77x 144. Were going to trim it from the forward back to 96. (Soft top now is 84). Reglass it and repaint the bottom the...
  16. C

    1987 24' Grady CC Project - Miami

    foam removal ... purchased twin 150 optimax 2008.. 450 hrs
  17. C

    1987 24' Grady CC Project - Miami

    got this from grady
  18. C

    1987 24' Grady CC Project - Miami

    more pics .. full split