I need better access to the bilge to replace bilge pump, and replace and rewire trim tab motor and check water pump for live well. The two round inspection hatches do not allow me to reach the pumps at all. Has anyone ever replaced the two hatches with one large rectangular inspection hatch in the floor of the motor well? It appears to be a pretty straightforward modification, but second opinions are always welcome. Good or bad? Anyone do it? Many thanks