- Joined
- Feb 11, 2020
- Messages
- 456
- Reaction score
- 86
- Points
- 28
- Location
- Samish Island, WA
- Model
- Sailfish
Coming along nicely, but wow - a lot of work! She's almost ready to splash. Yay!!
I have to finish the canvas - I'll try to get most of it this weekend. Here's a list of the jobs that I have done so far:
Make 3 replacement "outdoor" cushions
Make new canvas enclosure - (50%+ done)
Fab and install stainless rocket launcher
Buff, polish, wax hull above waterline
Scuff bottom - prime / paint
Patch / repair / replace hull striping
Strip and lay up deck panels
Strip and lay up 2 hatches
Patch holes from outriggers and fairing - top and sides
New gelcoat @ hardtop
Remove and replace cockpit rubber trim
Patch holes, dings, scuffs & gelcoat
Replace hinges, pulls, and selected hardware
Replace antenna
Rewire radio
Replace fuel management gauge - port side
Rewire Gauge panel
Add USB Charge station
Add 2 x Oontz speakers (nice!)
Install Electric Pot puller
Install 2 x Electric Downriggers
Install Lowrance HDS-10 and transducer
Install Lowrance NAC-1 autopilot system
Install NMEA 2000 network hardware
Remove a few unused hot "home runs"
Rewire battery maintenance / charger
Clean, inspect, test, (partial rewire) live well, raw water, 2 x bilge pumps
Service, fluid change, bleed trim tabs
Replace all drink holders (important!)
Paint inside of cabinets
Repair upholstery @ interior wall panel
Downsize center "bed" cushion / modify table.
Rebuild Macerator pump, service head.
Replace all water lines
Replace 2 sink fixtures
Replace fresh water "sink" with storage box.
Boat numbers
Add "Ladies" restroom sign 8^)
Motors (serviced prior to arrival)
- Check oil
- Check lower fluid
- replace exterior zincs
- replace head zincs
- grease all zert fittings
- Rebuild all Trim & Tilt hydraulic cylinders
- replace water separators
- tighten all tank fittings
- Replace Fuel & Vent fitting @ main tank.
I have to finish the canvas - I'll try to get most of it this weekend. Here's a list of the jobs that I have done so far:
Make 3 replacement "outdoor" cushions
Make new canvas enclosure - (50%+ done)
Fab and install stainless rocket launcher
Buff, polish, wax hull above waterline
Scuff bottom - prime / paint
Patch / repair / replace hull striping
Strip and lay up deck panels
Strip and lay up 2 hatches
Patch holes from outriggers and fairing - top and sides
New gelcoat @ hardtop
Remove and replace cockpit rubber trim
Patch holes, dings, scuffs & gelcoat
Replace hinges, pulls, and selected hardware
Replace antenna
Rewire radio
Replace fuel management gauge - port side
Rewire Gauge panel
Add USB Charge station
Add 2 x Oontz speakers (nice!)
Install Electric Pot puller
Install 2 x Electric Downriggers
Install Lowrance HDS-10 and transducer
Install Lowrance NAC-1 autopilot system
Install NMEA 2000 network hardware
Remove a few unused hot "home runs"
Rewire battery maintenance / charger
Clean, inspect, test, (partial rewire) live well, raw water, 2 x bilge pumps
Service, fluid change, bleed trim tabs
Replace all drink holders (important!)
Paint inside of cabinets
Repair upholstery @ interior wall panel
Downsize center "bed" cushion / modify table.
Rebuild Macerator pump, service head.
Replace all water lines
Replace 2 sink fixtures
Replace fresh water "sink" with storage box.
Boat numbers
Add "Ladies" restroom sign 8^)
Motors (serviced prior to arrival)
- Check oil
- Check lower fluid
- replace exterior zincs
- replace head zincs
- grease all zert fittings
- Rebuild all Trim & Tilt hydraulic cylinders
- replace water separators
- tighten all tank fittings
- Replace Fuel & Vent fitting @ main tank.
Last edited: